View Cart (0)  |  Contact Us  |  Sitemap

Overview

Our Plant

At Senoko Gasworks, 2 different types of gas-making reforming plants are used:
   » Cyclic Catalytic process type for peak requirements
   » Continuous Catalytic process type for base load operation

Gas production is scheduled to meet daily demand. Gas consumption fluctuates over a 24-hour daily cycle, with peak periods of high gas demand from 10am to 12 noon, and 5pm to 7pm.

Gas production utilises cutting-edge technology and is equipped with the most advanced automation control system, ensuring the continuous supply and delivery of town and natural gas island-wide.

All contents © copyright 2016 City Gas Pte Ltd (as Trustee). All rights reserved
FB
 
YouTube